摘要
论述高店水库砌石双曲薄拱坝的体型设计、分缝方式、缝的布置、坝体内部测温仪器的设置以及大坝封拱时机的选择。
This paper presents design of the dam body shape, the dam joints pattern, the arrangement of the joints, the arrangement of the internal thermometers, and the time schedule of joints closing of the masonry arch dam of Gaodian Reservior.
出处
《水电与新能源》
2014年第2期18-19,24,共3页
Hydropower and New Energy
关键词
高店水库
砌石拱坝
分缝
布置
Gaodian Reservoir
Masonry arch dam
Joints
Closing