推移质输沙量的计算及其应用

A METHOD FOR ESTIMATING ANNUAL AMOUNT OF BED LOAD
下载PDF
导出
摘要 基于推移质输沙率与水流动力条件之间的关系,提出了一种计算年平均推移质输沙量时,代表性水流动力条件的选择方法,同时将断面分为若干子断面进行计算,可以解决推移质沿断面不均匀输移的计算困难,计算过程中还考虑了推移质级配的逐时变化.所提出的计算方法应用于黄河青铜峡水库,计算了年平均推移质量,结果与实测淤积量符合很好. A new method is proposed to estimate annual amount of bed load, in which the typical hydrological year of discharge series is selected based on the relationship between the bed load rate and hydraulic factors. The lateral non-uniform bed load transport along the cross section is accounted for by dividing the basic section into certain number of sub-sections in which the bed load rate is calculated in terms of local velocities. In addition, the timevariation of size grading of bed load is taking into consideration. Finally, the method is applied to the Qingtongxia Reservoir. The estimated annual bed load amount agrees well with that observed.
作者 周济福
出处 《力学与实践》 CSCD 北大核心 2000年第6期34-36,共3页 Mechanics in Engineering
关键词 推移质 输沙量 水流动力 推移质级配 bed load, annual bed load amount typical hydrological year size grading of bed load
  • 相关文献

参考文献8

  • 1钱宁 万兆惠.泥沙运动力学[M].北京:科学出版社,1986.309. 被引量:29
  • 2武汉水利电力学院.河流泥沙工程学[M].北京:水利出版社,1982.. 被引量:6
  • 3水利电力部水利水电规划设计总院.水电站泥沙问题总结汇编[M].,1988.. 被引量:1
  • 4梁宗南.青铜峡水库入库推移质量的估算.水利电力部西北勘测设计院研究报告[M].,1985.. 被引量:1
  • 5水利电力部水利水电规划设计总院,水电站泥沙问题总结汇编,1988年 被引量:1
  • 6钱宁,泥沙运动力学,1986年 被引量:1
  • 7梁宗南,水利电力部西北勘测设计院研究报告,1985年 被引量:1
  • 8武汉水利电力学院,河流泥沙工程学,1982年 被引量:1

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部