由于选矿厂扩建对原有给排水系统提出了更高要求,通过采用增加水源泵站、高位水池,优化厂区内供水管网,尾矿库回水利用等有效措施来满足选矿扩能后对生产用水的需要。
Since the extension of the process plant makes a higher demand on the original water supply and drainage system, adopting effective measures such as increasing the number of water source pumping stations and head tanks, optimizing the water supply network at the plant and the return water utilization of tailings reservoir meet the needs of process water after mineral processing capacity expansion.
出处
《矿业工程》
CAS
2014年第1期68-69,共2页
Mining Engineering
关键词
选矿厂
给排水系统
循环水系统
process plant
water supply and drainage system
circulating water system