4Yang Yang,Xu Zhencheng, Hu Kangping, et al. Removal efficien eies of the constructed wetland wastewater treatment system at Bainikeng, Shenzhen [J] War. Sei. ~ Teeh. , 1995,32 (3) : 31 40. 被引量:1
8Cooper, P. F. and Peace, G. The potential for the application of constructed wetland in the village stituation in arid developing counties. Paper presented to the CIWEM Aqua Enviro Conference, Wastewater treatment: Standards and technologies to meet the challenge of the 21 Century, Leeds, 4 -6 April, 2000. 被引量:1