摘要
客运专线联锁系统在处理站联信息传输时遇到通信延时问题,给工程实施造成极大困扰。通过分析问题出现的根源,力求通过优化设计和实施的方式找到解决问题的方案。
The paper analyzes the causes of the communication delay which is a big trouble to the engineering construction projects when the interlocking system processes the liaison information between stations and yards of dedicated passenger lines (DPL), and gives a solution of optimizing the scheme and implementation mode based on the analysis of causes.