期刊文献+

基于电锅炉的热电厂消纳风电方案及其国民经济评价 被引量:184

Wind Power Accommodation by Combined Heat and Power Plant with Electric Boiler and Its National Economic Evaluation
下载PDF
导出
摘要 针对当前中国"三北"电网在冬季供暖期面临大量弃风的问题,提出了热电厂通过配置电锅炉来解耦其"以热定电"约束,进而降低强迫出力消纳弃风电力的方案。文中介绍了方案的基本运行原理,讨论了方案实施的机制条件,建立了评价方案节煤效益和国民经济性的数学模型,分析了其影响因素。理论和算例分析均表明,在当前国内"三北"地区各弃风严重的电网中,实施该方案具有明显的节煤效果和国民经济可行性。 Confronted by the problem of tremendous curtailment of wind power in the power grids of Northeast China,North China and Northwest China during heating period in winter,it is proposed that the constraint of forced power output determined by heat be decoupled by installing an electric boiler in the thermoelectric plant.The basic operating principles of the method are described,the implementation mechanism discussed,the mathematical model for evaluating its coal-saving benefit and role in national economy is developed,and the influencing factors are analyzed.The theoretical analysis and realistic examples show that the method is both coal-saving and economically feasible for the power grids of Northeast China,North China and Northwest China with significantly curtailed wind power.
出处 《电力系统自动化》 EI CSCD 北大核心 2014年第1期6-12,共7页 Automation of Electric Power Systems
基金 国家自然科学基金资助项目(51107007)~~
关键词 风电消纳 热电联产 电锅炉 热电解耦 弃风 wind power accommodation combined heat and power(CHP) electric boiler heat and power decoupling curtailed wind
  • 相关文献

参考文献23

二级参考文献164

共引文献742

同被引文献1394

引证文献184

二级引证文献2280

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部