摘要
介绍了向家坝水电站右岸地下厂房渗漏、检修排水系统设备和管路布置以及深井泵自动启停控制系统。工程实践表明,排水系统设计和实施的排水系统网络层次明晰、配置合理、容错性高、安全可靠,为向家坝水电站正常运行发挥了巨大作用。
The equipments and pipe layout of leakage and repair drainage system in the right bank underground powerhouse of Xiangjiaba Hydropower Station are introduced and the automatic control system of deep well pumps are analyzed. The actual operation shows that the design and implementation of drainage system has a clear network layout, reasonable configuration, high fault tolerance and high safety and reliability. The drainage system plays a great role on the normal operation of Xiangjiaba Hydropower Station.
出处
《水力发电》
北大核心
2014年第1期37-38,42,共3页
Water Power
关键词
地下厂房
排水系统
自动化控制
向家坝水电站
underground powerhouse
drainage system
automatic control
Xiangjiaba Hydropower Station