港口新建堆场的作业设备多元化筹措方案分析

Analysis of Diversified Equipment Financing Program of Port New Yard
下载PDF
导出
摘要 结合天津港某新建集装箱堆场的实例,提出了以银行贷款为设备筹措主要渠道、以经营性租赁为辅助渠道的作业设备筹措方案。通过对历史数据的回归分析,预测了新建堆场前期通过量。基于成本费用分析,确定了设备购置和租赁的比例。文中对港口新建堆场作业设备多元化筹措方案的研究,对设备精细化管理具有重要的参考价值。 Combined with a newly-built container yard of Tianjin Port example,the equipment financing program which bank loans is main channel and operating lease is auxiliary channel is proposed.Through regression analysis to historical data,the early throughput of the new yard is predicted.Based on cost analysis,the equipment rent-buy proportion is identified.The analysis of diversified equipment financing program of port new yard is of important reference value for the equipment refinement management.
作者 李萍
出处 《物流工程与管理》 2013年第7期98-100,共3页 Logistics Engineering and Management
关键词 港口堆场 设备多元化筹措 作业量 租买比 port storage yard diversified equipment financing workload rent-buy proportion
  • 相关文献

参考文献3

二级参考文献1

  • 1肖岚.油运企业运力发展方式的比较与选择[J]中国水运(理论版),2007(08). 被引量:1

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部