摘要
主要从方案考虑、关键点设计、材质及浇注结构等方面论述了926 t/h超高压再热CFB锅炉的点火装置的设计。
This paper discusses the design of 926t/h ultra high pressure reheat CFB boiler ignition device. Mainly from the scheme, key points of design, considering the material and concrete structure are discussed.
出处
《现代工业经济和信息化》
2013年第22期56-57,共2页
Modern Industrial Economy and Informationization
关键词
循环流化床锅炉
燃烧器
临界流化速度
circulating fluidized bed boiler
burner
critical fluidization velocity