深溪沟电站工程泄洪冲沙闸工程经过两年的运行,因多种原因冲损较严重。本文简述了多种新型高分子材料在泄洪冲沙闸补强修复工程的主要施工方法,可为类似工程提供技术参考。
After two years operation of water flushing sluice engineering in Shenxi gulley power station engineering, there are more serious damages for several reasons. This article introduces several main construction methods of new polymer materials in the water flushing sluice reinforcement renovation construction, which can provide technical reference for similar projects.
出处
《城市建筑》
2013年第22期334-335,共2页
Urbanism and Architecture
关键词
深溪沟电站
泄洪冲沙闸
冲损修补
Shenxi Gully station
flood flushing sluice
punch damage repair