摘要
结合北京市南水北调南干渠工程施工建设的具体任务,根据工程建设的实际情况,总结了一些管理经验,从质量与安全方面提出了管理措施,为后续的工程建设提供了宝贵经验。
The south-north water diversion project of Beijing combining with specific tasks of the construction of the south main canal engineering construction of according to the actual situation of engineering construction, summarizes some management experience, put forward management measures from quality and safety aspects, has provided valuable experience for the subsequent project construction.
出处
《山西建筑》
2014年第1期244-245,共2页
Shanxi Architecture
关键词
南水北调
南干渠工程
施工过程
建设管理
the south-to-north water diversion project, south main canal engineering, construction process, construction management