摘要
通过对郭壁水源地现状供水能力的分析、取水方案的比较,选择了合理的工程实施方案。
In the paper, the present water supply capacity of Guobi waer source field is analyzed, the new withdrawal schemes are compared and the reasonable engineering implementation scheme is selected.
出处
《山西水利科技》
2013年第4期11-12,37,共3页
Shanxi Hydrotechnics
关键词
水源地
井采
中奥水
中寒武水
汇水
water source field
withdrawal from well
water of Middle Ordovician Period
water of Middle Cambrian Period
flow concentration