摘要
隧洞掘进机(TBM)施工具有快速、安全、高效的特点,因此尤其在埋深大、距离长的隧洞中应用越来越多。影响TBM施工质量的因素主要有3个,即:设备状态、地质条件、组织管理。TBM掘进机施工主要分为三道工序,即开挖工序、衬砌工序(管片安装工序)、回填灌浆工序。文中论述了各工序的质量控制及质量缺陷的处理。
Constructing tunnel by TBM has the features such as high-speed,safety and high-efficiency,therefore,it is used more and more in constructing deep-buried and long tunnel.There are three factors that influence the quality of tunnel constructed by TBM,ie,machine condition,geological condition and organization management,and in the construction process there are three work procedure: excavation,lining and backfill grouting procedure.The paper states the quality control in every procedure and how to treat the quality fault.
出处
《山西水利科技》
2013年第3期37-39,共3页
Shanxi Hydrotechnics
关键词
隧洞掘进机
工序
质量控制
质量动态管理
TBM
work procedure
quality control
dynamic management of quality