摘要
通过对铅冶炼渣型要求及影响因素的分析,讨论了云南锡业股份有限公司在一座顶吹炉内连续完成硫化铅精矿的氧化熔炼、液态高铅渣还原和锌渣烟化三个冶炼过程的渣型选择及实际控制情况。
By analyzing lead Smelting slag type requirement and affecting factors, the paper discusses slag type selection and actual control of oxidation and smelting, liquid lead-rich slag reduction and zinc slag fuming of lead sulphide concentrate continuously completed in a top-blown furnace made by Yunnan Tin Company Limited.
出处
《有色冶金设计与研究》
2013年第6期23-25,共3页
Nonferrous Metals Engineering & Research
关键词
顶吹炉
一炉三段
直接炼铅
渣型选择
控制
top-blown furnace
one furnace three stages
direct lead smelting
slag type selection
control