鉴于杜229块蒸汽驱先导试验较好的开发效果,进行蒸汽驱的扩大试验,为该块规模汽驱作准备。方案设计中在分析先导试验效果的基础上,利用数值模拟方法优化扩大试验的主要注采参数,最大限度地提高蒸汽驱的开发效果和经济效益。
Since pilot test of steam flooding have good response,it is decided to expand the test preparing for commercial steam flooding in Block Du 229.In order to enhance oil recovery rate and get high economic benefit,main injection-production parameters of steam flooding expanding test are optimized by numerical simulation on the base of pilot test evaluation.