介绍了生活垃圾填埋场老场扩建工程中横向扩建、纵向扩建两种常用的方式及各自的设计要点。结合浙江西部某县城生活垃圾填埋场的扩建工程实例,分析了在填埋场扩建工程设计中应考虑的与老场系统衔接、扩建后新场垃圾堆体不均匀沉降及新场堆体稳定性等问题,并依照工程实际提出了解决方案。
It was presented the expansion patterns of old municipal solid waste(MSW) landfill site,including the horizontal way and vertical way,as well as their respective focuses.Combined with a case of expanding municipal solid waste landfill site in Zhejiang Province,it was also analysed several problems needing consideration in the design of a MSW landfill site expansion project,such as the connection with the original landfill site,differential settlement of waste pile in the new landfill site,and its stability etc,and effective solutions were proposed.
出处
《环境工程》
CAS
CSCD
北大核心
2013年第5期117-120,共4页
Environmental Engineering
关键词
横向扩建
纵向扩建
不均匀沉降
稳定性分析
horizontal expansion
vertical expansion
differential settlement
analysis of stability