摘要 结合锦屏一级水电站拱坝混凝土施工期的全级配、湿筛试件所测试的各项试验结果,分析了坝体A区、B区、C区混凝土的抗裂性能。指出:因不同评价指标的物理意义不同,各个指标之间评价结果亦不同。结论认为:采用综合指标开展评价,能较好地体现混凝土的实际抗裂性能,对于施工期防裂分析具指导意义。 In accordance with all the testing results from the concrete specimens of the full-graded and wet-screened tests made during the construction of the arch dam for Jinping I Hydropower Station, the concrete cracking-resistances of the zone A (C18040), zone B(Cts035), zone C(C18030) therein are analyzed, and then it is pointed out that as the physical meanings are different for various evaluation indexes, the evaluation results among all the evaluation indexes are also different. Therefore, it is concluded that the application of the comprehensive index to the evaluation can give out the actual cracking-resistance of the con- crete preferably; which has a guiding significance for the analysis made on the cracking-resistance during the construction.
出处 《水利水电技术》 CSCD 北大核心 2013年第10期70-72,共3页 Water Resources and Hydropower Engineering
关键词 抗裂能力 评价指标 全级配试验 湿筛试验 拱坝 锦屏一级水电站 cracking-resistance evaluation index full-graded test wet-screened test arch dam Jinping I Hydropower Station
  • 相关文献

参考文献5

二级参考文献19

共引文献30

同被引文献8

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部