5VYCE J M. Fault-removal Procedures for Rigid Pavement Joints [R] .New York: New York State Department of Transporta- tion, Engineering Research and Development Bureau, 1985. 被引量:1
6KHAZANOVICH C, DARTER M I, YU H T. Mechanistic- empirical Model to Predict Transverse Joint Faulting [R] . Transportation Research Record, 2004, 1986: 34-45. 被引量:1
7DERE Y, ASGARI A, SOTELINO E D, et al. Failure Prediction of Skewed Jointed Plain Concrete Pavements Using 3D FE Analysis [J] .Engineering Failure Analysis, 2006, 13: 898 - 913. 被引量:1
9SCOTT M, AHMED S, AFTAB A M. Modeling of Concrete Pavement Dowel- slab Interaction [ C] //40^th Transportation Specialty Conference of the Canadian Society for Civil Engineering. Challenges Ahead: 2002.2621 -2630. 被引量:1
10KSMBATI K, STAIGLE R. Faulting Performance Modeling for Undoweled Plain Concrete Pavements [ J] .Transportation Research Record, 1995, 1482:1 -6. 被引量:1