斜拉桥钢箱梁施工过程有限元分析 被引量:3

Finite Element Analysis of Steel Box Girder Construction Process of Cable-Stayed Bridge
下载PDF
导出
摘要 以厦漳跨海大桥主桥钢箱梁的架设过程为背景,通过对钢箱梁节段的有限元计算,优化了安装吊点,将原来的少点数、应力集中情况优化为多吊点、应力分散的良好架设安装状态;对钢箱梁吊装梁段的自振特性进行研究,以指导施工过程中使用具有振动现象的机械设备;分析计算桥面吊机附近瞬态工作最大应力,以掌握施工中最不利工作应力,确保安全施工。 For this study, the installation process of the steel box girder of the main bridge of Xiazhang Sea-Crossing Bridge was taken as the background. The lifting points for installation were optimized through the finite element calculation of the steel box girder sections. Originally, there was a small number of lifting points and the problem of stress concentration also existed, after the optimization, a sound installation condition of multiple lifting points and good stress distribution were created. The natural vibration property of the sections of the steel box girder was studied to guide the application of the equipments which showed vibration during the construction process. The maximum stress near the derrick crane under the transient working condition was analyzed and calculated, so as to control the most ~nfavorable working stress during the construction process / and ensure the safety of the construction.
作者 熊彪 董科
出处 《世界桥梁》 北大核心 2013年第5期53-57,57+56,共5页 World Bridges
关键词 斜拉桥 钢箱梁 桥梁施工 有限元法 cable-stayed bridge. steel box girder bridge construction finite element method
  • 相关文献

参考文献12

二级参考文献53

共引文献100

同被引文献27

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部