2S.leen,B.kang.Information management to integrate cost and schedule of civil engineering project [J]. Journal of Construction Engineering and Management, 1998,124 (5) : 381-389. 被引量:1
3H.Adeli,A.karim.Scheduling cost optimization and neural dynamics model for construction [J]. Journal of Construction Engineering and Management, 1997,123 (4) : 450-458. 被引量:1