拔贡水电站改扩建工程纵向混凝土围堰设计 被引量:2

Design of Longitudinal Concrete Cofferdam of Bagong Hydropower Extension Project
下载PDF
导出
摘要 文章简要介绍了拔贡水电站改扩建工程纵向混凝土围堰的结构型式设计和稳定、应力计算。因纵向混凝土围堰挡水水头不高,因此围堰采用重力式C15素混凝土围堰,方便施工,节省投资,加快工程进度,有利于本工程尽早蓄水发电。 The paper makes a brief introduction to the structure type design,the stability and stress calculations on the longitudinal concrete cofferdam of Bagong Hydropower Extension Project.A gravity-type C15 plain concrete cofferdam is adopted for the project due to its low water-retaining head,which not only reduces the project cost,but also facilitates the construction and speeds up construction progress,which is conductive to an earlier power generation of the project.
作者 赵光辉 简祥
出处 《红水河》 2013年第4期1-4,7,共5页 Hongshui River
关键词 纵向混凝土围堰 抗滑稳定 基础应力 抗倾覆 拔贡水电站改扩建工程 longitudinal cofferdam anti-sliding stability foundation stress anti-overturning Bagong Hydropower Extension Project
  • 相关文献

参考文献4

  • 1DLT5087-1999,水电水利工程围堰设计导则[S]. 被引量:2
  • 2DL5108-1999.混凝土重力坝设计规范[S].[S].,.. 被引量:96
  • 3DL5180-2003.水电枢纽工程等级划分及设计安全标准[S].[S].,.. 被引量:27
  • 4SL 303-2004,水利水电工程施工组织设计规范[S]. 被引量:86

共引文献205

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部