空投变压器时线路距离Ⅰ段保护误动原因分析及对策 被引量:4

Cause Analysis on Line Distance Zone I Protection Maloperation in Transformer No-load Operation and its Countermeasures
下载PDF
导出
摘要 对某I10 kV内桥接线变电站进线开关距离I段保护在空投变压器时误动的原因进行了具体分析,表明电压互感器二次回路切换延时的存在是造成此次误动的主要原因。建议距离保护直接接入未经开关及刀闸辅助接点切换的电压互感器二次电压,,新建的110 kV内桥接线变电站高压侧母线安装三相电压互感器,110 kV线路侧不装设电压互感器或只装设一相电压互感器。 The paper analyzes the causes of distance zone I protection maloperation of the incoming line switch in transformer no-load operation in a l lO kV substation with inner bridge connection, points out that the voltage transformer secondary circuit switching delay time is the main cause of this maloperation. Based on which, the paper suggests that directly connecting distance protection device with voltage transformer secondary voltage without switching may help solve the problem, installing three-phase voltage transformers on the 110 kV busbar instead of nlounting voltage transformers on the 110 kV line, or installing only single-phase voltage transformer on the 110 kV line in the new 110 kV substation with inner bridge connection.
作者 刘桂林
机构地区 徐州供电公司
出处 《陕西电力》 2013年第8期60-63,共4页 Shanxi Electric Power
关键词 距离保护 误动 励磁涌流 电压切换 内桥接线 distance protection maloperation magnetizing inrush current voltage switching inner bridge connection
  • 相关文献

参考文献8

二级参考文献4

共引文献25

同被引文献42

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部