天钢3200m^3高炉中修开炉达产实践 被引量:1

Practice of Intermediate Repair, Start-up and Output Arrival at 3200 m^3 BF of TISCO
下载PDF
导出
摘要 天津钢铁集团有限公司3 200 m3高炉由于炉体铜冷壁破损严重、炉缸侧壁温度持续居高不下,必须进行停炉中修以更换部分铜冷却壁。介绍了开炉的装料情况、加风过程等。开炉后,通过采用合理的上下部调剂、及时合理的热制度、造渣制度的调节,使高炉炉况稳定、顺行,快速达产。总结了成功和不足之处,为以后高炉快速开炉、达产积累了经验。 Due to serious damage of copper stave and constant high temperature at hearth side, 3 200 m3 BF of Tianjin Iron and Steel Group Company Limited (TISCO) must be shut down for an intermediate repair to exchange partial copper staves. The paper describes the charging and blast volume increase process of BF start-up. Afler start-up, through reasonable upper and lower parts regulation, timely and reasonable heat system and slag building adjustment, the blast furnace ran smoothly with stable conditions and fast reached the output. Summarizing the successes and defects, the paper accumulates experience for later BF start-up and output arrival.
出处 《天津冶金》 CAS 2013年第A01期18-20,共3页 Tianjin Metallurgy
关键词 高炉 中修 开炉 实践 BF intermediate repair start-up practice
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部