摘要
介绍了EBZ100掘进机在葛泉矿26°煤巷上山掘进情况,对施工过程中的大坡度爬坡、大坡度机掘安全施工、大坡度皮带延长的难题进行了分析,制定了可行的安全技术措施,保证了施工的安全,实现了高效掘进。
The thesis introduced EBZ100 heading machine drivage in Gequan mine roadway under the angle of 26 °.The construction process of the large slope grade,big slope digging machine safety construction,large slope belt extension problem were analyzed.Feasible safety technical measures were implemented to ensure the construction safety efficiently.
出处
《煤炭与化工》
CAS
2013年第3期44-46,共3页
Coal and Chemical Industry
关键词
掘进机
大坡度
上山
掘进
heading machine
large slope
up the hill
tunneling