期刊文献+

注水井分层测控系统 被引量:4

Separate test and control system for water flooding wells
下载PDF
导出
摘要 现有的注水工艺维护费用过高、能耗大 ,增加了油田的开发成本 ,同时难于测试与控制注水层的注水量 .研制了由微机控制系统、传动系统、调节器等组成的注水井分层测控系统 ,实现了多油层的分层注水及注水量的测试、调整和控制一体化 ,尽管增加了一次性投资 。 The water flooding technology now available is not practical due to higher maintenance cost and difficulties in testing and controlling. The separate test and control system for petroleum water flooding consists of microprocessor control system and drive system and regulator and so on. It realizes separate petroleum water flooding in some oil layers and testing and controlling the volume of water flooding. The system results in an increase in the cost of the first investment, but it reduces maintenance cost and improves the whole oil field economic performance.
出处 《大庆石油学院学报》 CAS 北大核心 2000年第4期87-88,共2页 Journal of Daqing Petroleum Institute
关键词 注水井 分层注水 测控系统 油田开发 注水量 water flooding well separate water flooding in some oil layers testing and controlling system
  • 相关文献

参考文献4

  • 1万仁溥编著..现代完井工程[M].北京:石油工业出版社,1996:309.
  • 2蒋汉青 赵子刚.采油工艺实践[M].哈尔滨:黑龙江科学技术出版社,1993.139-162. 被引量:3
  • 3万仁溥,现代完井工程,1996年,290页 被引量:1
  • 4蒋汉青,采油工艺实践,1993年,139页 被引量:1

共引文献2

同被引文献17

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部