红透山铜锌矿深部开采接续开拓系统工程研究与设计过程中,通过上部系统与新系统采矿生产有序的衔接设计,解决了现实采矿技术难题,做到了设计方案与原系统科学、合理地结合,创新了设计思路与方法。
In the process of engineering research and design of the successive development system for the deep deposts in Hongtoushan Copper-zinc Mine,the connection of mining operation between the upper system with the new system was made in an orderly manner to solve the actual technical problems.As a result,the design proposal and the existing system were integrated in a scientific and reasonable way,creating a new design idea and method.
出处
《化工矿物与加工》
CAS
北大核心
2013年第8期42-43,48,共3页
Industrial Minerals & Processing
关键词
深部开采接续
开拓系统工程
独立竖井系统方案
deep mining succession
development system engineering
separate shaft system
underground air compressor
middlelevel height