摘要
A区块为榆树林油田采出程度最高的区块,文章通过对区块开发过程中发现的矛盾和问题进行分析,从常规水驱的角度出发,提出有针对性的调整方案,进行总结和提炼,形成一套适合A区块乃至是适合全油田的工作模式。
Block A has the highest degree of reserve recovery in Yushulin Oilfield.Through analysis of the contradiction and problems found during block development,and from the perspective of conventional water flooding,targeted adjustment scheme is put forward in this paper.By summarizing and refining,this paper aims to form a suitable work mode for block A and even the whole oilfield.
出处
《价值工程》
2013年第22期63-64,共2页
Value Engineering
关键词
注水调整
水驱控制程度
平面矛盾
层间矛盾
water injection adjustment
waterflooding control degree
flat contradiction
contradiction between layers