期刊文献+

塘子凹31-1^#矿柱回采数值模拟研究 被引量:4

STUDY ON NUMERICAL SIMULATION OF PILLAR RECOVERY IN 31-1# ORE BODY OF TANGZIAO
下载PDF
导出
摘要 针对云锡公司采选分公司31-1#矿体的赋存条件及矿柱的特点,结合地压控制理论和回采工艺,优选了九个矿柱回采方案,采用三维有限元软件3D-σ对各矿柱回采方案进行了数值计算模拟研究。通过对各回采方案计算结果对比分析,优化了矿柱回采方案,对矿山实际工程具有重要的意义和参考价值。 Based on the habitat and characteristic of pillar and occurrence conditions of 31-1# ore body in Mining and Mineral Processing Plant of Yunnan Tin Company Ltd. , combined with ground control theory and mining technology, this paper proposes nine recovery mining jamb programs. By three-dimensional finite element software, numerical calculation studies of each program are carried out. Through the comparison and analysis of calculated resuits, the recovery mining jamb programs are optimized, which has an important meaning and reference value to the actual mine project.
出处 《矿冶》 CAS 2013年第2期11-15,共5页 Mining And Metallurgy
关键词 地压控制 矿柱回采 三维有限元法 ground pressure control pillar recovery three-dimensional finite element method
  • 相关文献

参考文献6

二级参考文献11

共引文献25

同被引文献90

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部