摘要
根据某场地的工程地质条件,介绍了地基处理设计方案、振动沉管碎石挤密桩的施工工艺、地基检测效果,分析了地基处理不成功的原因及所采取的补救措施,并提出了一些建议,为类似工程场地施工提供了参考。
According to the engineering geological condition of a site, this paper introduced the design scheme of foundation treatment, the construction technique of vibration sinking tube gravel compaction pile, the foundation detection effect, analyzed the reasons and remedial measures of foundation treatment unsuccessful, and put forward some suggestions, provided reference for similar engineering construction site.
出处
《山西建筑》
2013年第20期65-66,共2页
Shanxi Architecture
关键词
饱和粘性土
振动沉管
碎石挤密桩
复合地基载荷试验
saturated cohesive soil
vibration sinking tube
gravel compaction pile
composite foundation load test