期刊文献+

港珠澳大桥岛隧工程西人工岛暗埋段隧道模板设计及施工技术 被引量:7

Design and Technology for Construction of Formwork for Buried Tunnel in West Man-made Island for Hong Kong - Zhuhai - Macao Bridge
下载PDF
导出
摘要 港珠澳大桥人工岛暗埋段隧道结构施工中,针对结构特点及所处施工环境,开发了与承插型盘扣式钢管支架配套的系统模板,实现了大体量混凝土在外海深基坑进行现浇实施工,可为类似工程提供借鉴。 During the construction of the buried tunnel in the west man-made island for the Hong Kong-Zhuhai-Macao Bridge,a systematic formwork complete with ring-lock scaffolds according to the characteristics of the structure and the construction environment,with which mass concrete was successfully placed in offshore deep foundation pits,providing reference for similar engineering works.
出处 《中国港湾建设》 2013年第3期49-54,共6页 China Harbour Engineering
关键词 港珠澳大桥 隧道 系统模板 承插型盘扣式钢管支架 Hong Kong-Zhuhai-Macao Bridge Tunnel system formwork ring-lock Scaffold
  • 相关文献

参考文献3

  • 1JGJ231-2010,建筑施工承插型盘扣式钢管支架安全技术规程[S]. 被引量:13
  • 2江正荣编著..建筑施工计算手册 第2版[M].北京:中国建筑工业出版社,2007:1263.
  • 3建筑施工手册编委会.建筑施工手册.5版[M].北京:中国建筑工业出版社,2012. 被引量:1

共引文献12

同被引文献28

引证文献7

二级引证文献13