摘要
电排站排水流道结构经多年运行,会因地基沉陷、荷载增加而产生不同程度的损伤,建设新承台保持工程原有功能非常必要,本文通过运用灌浆技术对管道建立了新的管床承台,有助于管道继续发挥其排水功能。
Electric pump station drainage flow channel structure is operated for many years. Different degrees of damages can be caused due to ground subsidence and load increase. It is necessary to construct a new cushion cap to keep the original function of the project. The paper uses grouting technology to establish a new pipe bed cushion cap on the pipeline, thereby assisting the pipeline to continuously play its drainage function.
出处
《中国水能及电气化》
2013年第6期1-5,共5页
China Water Power & Electrification
关键词
电排站
流道
灌浆
承台
electrical pump station
flow channel
grouting
cushion cap