期刊文献+

组合权在高层建筑施工安全评价中应用研究 被引量:1

APPLICATION STUDY OF COMBINATION WEIGHTING FOR SAFETY EVALUATION IN HIGH-RISE BUILDING CONSTRUCTION
下载PDF
导出
摘要 为准确评价不同高层建筑项目施工安全状况,建立了组合权的改进逼近理想解排序的综合评价方法。该方法通过信息熵权和AHP组合加权,利用改进逼近理想解排序方法(TOPSIS)进行运算。通过对西安某地产项目下属6个高层建筑施工现场进行评价,得出了各高层建筑施工项目安全变化趋势。评价过程和结果证明该评价方法简便易行、结论合理、易于推广使用。 For accurate evaluation of different high-rise building project construction safety situation, this paper establishes a comprehensive evaluation method based on combination of the right and improvement approximation ideal solution sort. Through combination the information entropy weight with AHP combined weighted, this method utilizes improved approach ideal solution ( TOPSIS ) for operation. Based on evaluation of a real estate projects subordinate six high-rise building construction field in Xi' an, it is concluded the trend of the evaluation of the project high-rise building construction safety. The evaluation process and the results show that the evaluation method is simple, convenient and feasible and the conclusion is reasonable so that the method is easy to popularize the use.
出处 《建筑技术开发》 2013年第6期61-64,共4页 Building Technology Development
关键词 高层建筑 施工安全 评价体系 组合权 改进TOPSIS high-rise buildings construction safety evaluation system combination weighting improved TOPSIS
  • 相关文献

参考文献8

二级参考文献25

  • 1张小栓,高明,张健,赵明,傅泽田.电子商务网站评价方法研究综述[J].情报杂志,2007,26(6):2-5. 被引量:40
  • 2Schubert P. EWAM : Evaluation of electronic commerce applications from the customer' s viewpoint. International Journal of Electronic Commerce, Winter, 2002,7(2) :51 - 80. 被引量:1
  • 3Wang C L, Yoon K S. Multiple attribute decision making. Berlin: Spring-verlag, 1981. 被引量:1
  • 4Olson D L. Comparison of weights in TOPSIS models. Mathematical and Computer Modelling, 2004 (40) : 721 - 727. 被引量:1
  • 5Tzenga G H, Lina C W, Oproicovic S M. Multi-criteria analysis of alternative-fuel buses for public transportation. Energy Policy, 2005 (33) :1373 - 1383. 被引量:1
  • 6Yang T, Chou P. Solving a multiresponse simulation-optimization problem with discrete variables using a multiple-attrlbute decision- making method. Mathematics and Computers in Simulation, 2005 (68) :9 -21. 被引量:1
  • 7Tsanra S H, Changb T Y, Yena C H. The evaluation of airline service quality by fuzzy MCDM. Tourism Management, 2002 ( 23 ) : 107 - 115. 被引量:1
  • 8俞明南 王东华.现代企业管理[M].大连:大连理工大学出版社,1999.. 被引量:2
  • 9Pedrycz W. Fuzzy neural networks with reference neurons as pattern classifiers [ J]. IEEE Trans Neural Networks, 1997,3:36- 37. 被引量:1
  • 10Kamal M. Application of the AHP in project management[J]. International Journal of Project Management, 1999,19:19 - 27. 被引量:1

共引文献94

同被引文献1

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部