1G.Clayton,C.Howe.cost as a driver in advance composite aero-space research. 被引量:1
2Gutowski,T.G.,Neoh,E.and Polgar,K.C.Adaptive Frame-work for Estimating Fabrication Time of Advanced Composites Manufac-turingProcesses,October1995(Massachusetts Institute of Technology). 被引量:1
3Ting P K, Zhang Chuck, Wang Ben. Product and process cost estimation with fuzzy multi attribute utility theory [J]. The Engineering Economist, 1999, 44(4): 303-331. 被引量:1
4Le Blanc D J. Advanced composites cost estimating manual, AFFDL TR- 76 - 87 [R]. California: Northrop Corporation, 1976. 被引量:1
5Ramkumar R I., Dewhurst P, Saha S K. Manufacturing cost model for composites [C] // Proceedings of the 23rd International SAMPE Technical Conference. Lake Kiamesha,USA: SAMPE, 1991:982-994. 被引量:1
6Mabson G E, Flynn B W, The use of COSTADE in developing composite commercial aircraft fuselage structures Part 3 [C]// Proc of 35th AIAA/ASME/ASCE/AHS/ASC Conf. Hilton Head, SC, USA.- AIAA, 1994: 1384-1393. 被引量:1
7Gutowski T G, Houl T D, Dillon G, et al. Development of a theoretical cost model for advanced composite fabrication [J]. Composites Manufacturing, 1994, 5(4): 231-239. 被引量:1
8Haffner S M. Cost modeling and design for manufacturing guidelines for advanced composite fabrication [D]. Massachusetts: MIT, 2002. 被引量:1
9Restar S A. Advanced airframe structural materials: A primer in cost estimating methodology, RAND /R- 4016- AF [R]. Santa Monica, CA: Rand Corp, 1991. 被引量:1
10Haffner S M, Gutowski T G. Manufacturing time estimation laws for composite materials [C] // NSF Conference. Vancouver B C, Canada: National Science Foundation, 1999. 被引量:1