期刊文献+

碎石长桩与水泥土短桩复合加固液化土的孔压比变化规律探讨 被引量:2

Study on Pore Pressure Ratio of Liquefiable Sand Soil Reinforced by Long Gravel Pile and Short Soil-Cement Pile
下载PDF
导出
摘要 通过碎石长桩与水泥土短桩复合加固液化土振动台试验,研究了未加固和复合加固的模型地基在振动过程中的超静孔隙水压力和孔压比的变化过程,结果表明加固过的地基能够明显抑制深层和中层土体液化的发生,揭示了碎石长桩与水泥土短桩复合对液化土的加固机理,研究成果可为以后在实际工程中的应用提供一些参考依据。 By the shaking test of liquefiable soil reinforced by long gravel pile and short soil-cement pile,pore water pressure and pore pressure ratio variation process during vibration were analyzed for unreinfored foundation model and the foundation model reinforced by long gravel pile and short soil-cement pile composite.The reinforced foundation significantly limited the liquefaction of middle and deep soil.The reinforcement mechanism of liquefiable soil by long gravel pile and short soil-cement pile was revealed.The results provide some references for practical project liquefiable sand soil reinforcement in the future.
出处 《太原理工大学学报》 CAS 北大核心 2013年第3期378-380,404,共4页 Journal of Taiyuan University of Technology
基金 国家自然科学基金资助项目(50578104)
关键词 碎石长桩 水泥土短桩 液化砂土 超静孔隙水压力 孔压比 long graval pile short soil-cement pile liquefiable sand soil excess pore water pressure pore pressure ratio
  • 相关文献

参考文献7

  • 1杨庆陶..桩体加固液化砂土的振动台试验研究[D].太原理工大学,2008:
  • 2闫卫泽..散体材料砂桩加固液化砂土的振动台试验研究[D].太原理工大学,2007:
  • 3GB/T50123-1999,土工试验方法标准[S].北京:中国计划出版社,1999. 被引量:6
  • 4龚晓南.地基处理手册(第三版)[M].北京:中国建筑工业出版社,2008. 被引量:93
  • 5JGJ79-2002.建筑地基处理技术规范[S].北京:中国建筑工业出版社,2003. 被引量:2
  • 6闫卫泽,牛琪瑛,杨庆陶.复合地基抗液化振动台试验中模型的制备[J].山西建筑,2007,33(4):89-90. 被引量:5
  • 7刘建君..多元复合桩加固液化土模型的振动台试验研究[D].太原理工大学,2012:

二级参考文献2

共引文献100

同被引文献21

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部