摘要
无底柱分段崩落法在和睦山铁矿开采过程中遇到通风困难、爆破效果差、巷道变形严重、回收率低等诸多问题。从5个方面提出了改进和优化措施,对结构参数和生产工艺等进行调整,取得了很好的效果。
Many problems like difficult in ventilation, poor blasting effect, serious deformation of roadway, low recovery rate existed in mine process of Hemushan Iron Ore by non-pillar sublevel caving. Improvement and optimization measures were proposed from five aspects, adjustments were done on structure parameters and production technology and so on, good effect obtained.
出处
《现代矿业》
CAS
2013年第5期8-10,35,共4页
Modern Mining
关键词
无底柱分段崩落法
应用
优化
Non-pillar sublevel caving, Application, Optimization