引黄工程北干线平鲁地下泵站防渗排水设计

Pinglu Underground Pumping Station Seepage Control and Drainage Design of North Main of the Yellow River Diversion Project
下载PDF
导出
摘要 引黄工程平鲁地下泵站位于大梁水库右岸坝肩上游西南山体下,为二等工程,主要建筑物包括地下及地面两大部分。综合考虑工程布置、地质条件等情况,采用堵、排结合形式,较好解决了顶部水库条件下地下厂房的防渗、排水设计,对类似工程设计提供经验。 Pinglu underground pumping station of the Yellow River Diversion Project is located in the southwest mountain,upstream of the right abutment of the Daliang Reservoir.It is a Class II project.The main structures are divided into the surface and underground parts.Considering the project layout and geological conditions,plugging and drainage are combined in seepage control and drainage design of the underground powerhouse under top reservoir conditions,which provides an experience for similar engineering design.
出处 《水利水电工程设计》 2013年第2期1-2,56,共2页 Design of Water Resources & Hydroelectric Engineering
关键词 引黄工程 北干线 地下厂房 防渗排水 设计 north main of the Yellow River Diversion Project,underground powerhouse,seepage control and drainage design.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部