摘要
引黄工程平鲁地下泵站位于大梁水库右岸坝肩上游西南山体下,为二等工程,主要建筑物包括地下及地面两大部分。综合考虑工程布置、地质条件等情况,采用堵、排结合形式,较好解决了顶部水库条件下地下厂房的防渗、排水设计,对类似工程设计提供经验。
Pinglu underground pumping station of the Yellow River Diversion Project is located in the southwest mountain,upstream of the right abutment of the Daliang Reservoir.It is a Class II project.The main structures are divided into the surface and underground parts.Considering the project layout and geological conditions,plugging and drainage are combined in seepage control and drainage design of the underground powerhouse under top reservoir conditions,which provides an experience for similar engineering design.
出处
《水利水电工程设计》
2013年第2期1-2,56,共2页
Design of Water Resources & Hydroelectric Engineering
关键词
引黄工程
北干线
地下厂房
防渗排水
设计
north main of the Yellow River Diversion Project,underground powerhouse,seepage control and drainage design.