摘要
针对连云港港30万吨级航道一期工程疏浚工程H1.1标段工程特点,论述水下排泥管线铺设方法以及铺设过程中管路破损或堵管后的处理措施,对绞吸船水下排泥管铺设具有指导意义,可减少因管线问题造成的绞吸船停产,加快工程进度。
This article deals with the underwater pipeline laying methods and measures for pipe damaging and blocking with case study of phase 1 project of Lianyungang 300 000-ton channel dredging, for the purpose of minimizing the suspension of pipeline-failure-related work and speeding up the project progress.
出处
《水运工程》
北大核心
2013年第5期184-188,共5页
Port & Waterway Engineering
关键词
水下排泥管线
铺设
控制
underwater pipeline
laying
controlling