期刊文献+

带非全埋地下室的高层建筑嵌固端的选取研究 被引量:5

Research on the Fixings of the Tall-Building with Semi-Basements
下载PDF
导出
摘要 高层建筑在进行结构分析之前应首先确定结构嵌固端所在的位置。本文采用M法模拟回填土对于高层建筑地下室的约束,并运用有限元分析软件MIDAS GEN对结构进行静力弹塑性分析。研究得出,一面开敞的非全埋地下室嵌固端可选在地下室顶板处,并在一定范围内可通过增大连梁及框架梁刚度与增加底层竖向构件配筋的方法来延迟地下一层塑性铰出现的时间,使结构趋于安全。 In making structural analysis of tall-buildings, the position of structures'fixings must be decided first. In this study, we adopted M method to simulate backfillg constraint on basements of tall-buildings, and used MI-DAS GEN to make static elastoplastic analysis of the structures. We found that fixings of one side open semi-basements can be positioned on the roof. Moreover, it was found that to increase the rigidity of coupling and frame beams, as well as to increase the amount of component reinforcement both delays the appearance of plastic hinges and consequently enhance the safety of the structures.
出处 《贵州大学学报(自然科学版)》 2013年第2期95-98,103,共5页 Journal of Guizhou University:Natural Sciences
关键词 非全埋地下室 嵌固端 M法 静力弹塑性分析 塑性铰 semi-basement fixing M method static elastoplastic analysis plastic hinge
  • 相关文献

参考文献3

共引文献2

同被引文献19

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部