摘要
介绍因青藏铁路更换转辙机而新增的ZDJ9转辙机与ITCS列控系统HSC转辙机控制模块间的接口电路。分析接口电路的动作时序,验证其与HSC转辙机控制模块动作时序相匹配,并满足转辙机动作要求。
The paper introduces the newly added interface circuit between ZDJ9 point machine and HSC point machine control module of the ITCS train control system due to replace the point machine in Qinghai- Tibet railway, and analyzes the operational time sequence of the interface circuit, in order to verify whether it is matching with the operational time sequence of HSC point machine control module, and meeting the operational requirements of the point machine.
出处
《铁路通信信号工程技术》
2013年第2期81-84,共4页
Railway Signalling & Communication Engineering