摘要
以南京某工程为例,介绍了先施工底板后施工桩基础的逆作施工方法,解决了该工程因设计变更而造成的支护桩支护能力不足问题,确保了工程的顺利施工。
Taking one project in Nanjing, the inverse construction method of the first floor construction then the construction of the pile foundation is introduced, which can solve the problem of design change causing the supporting ability of supporting piles insufficient, and ensure the engineering construction smoothly.
出处
《混凝土与水泥制品》
北大核心
2013年第5期78-80,共3页
China Concrete and Cement Products
关键词
深基坑支护
大直径桩
逆作法
防水
Deep foundation pit supporting
Big diameter piles
Inverse construction method
Waterproof