科学的施工管理能保证工程的安全、质量和进度,还能使工程的效益最大化。在某核电厂西部陆域软基加固工程中采用合理有效的施工管理方法,解决了工程中遇到的排水板打设困难和堆载过程土体强度不足的难题,且大幅提前了工程进度。
Scientific construction management can guarantee safety, high quality and progress of project, and can make project benefit maximum. At the soft foundation treatment construction of a nuclear power plant, the problems such as drainage plate striking difficult and lower strength of soil at the heaped loading process are resolved by using reasonable and effective construction management methods, and the project progress is largesized advanced.