洋山深水港区一期工作船码头增加滚装接卸功能的研究 被引量:1

Research on Adding Roll-on Roll-off Function in Working Boat wharf of Yangshan Deepwater Port District (Phase 1)
下载PDF
导出
摘要 为提高洋山深水港区一期工作船码头生产效益,开展了对该码头增加滚装接卸功能的研究。介绍该码头的现状。从泊位长度、码头前沿水深、作业平台高程、航道、锚地等方面研究。对码头、引桥、靠船簇桩结构受力,系船柱、护舷配套设施等方面分析。得出结论该码头结构满足50000t级滚装船靠泊和装卸作业的要求。 In order to enhance productive efficiency of working boat wharf of Yangshan Deepwater Port District (Phase 1), a research is implemented on adding roll-on roll-off function in this wharf. The berth length, depth of water in front of wharf, elevation of working platform, approach channel, anchorage area etc. are researched. Wharf, approach bridge, force bearing of breasting dolphin, mooring post, fender supporting facilities are analyzed. Conclusion has been got that needs of berthing 50 000 t roll-on roll-off ship and handling operation is met by this wharf structure.
作者 徐嵬
出处 《港口科技》 2013年第4期30-34,38,共6页 Port Science & Technology
关键词 港口 码头 滚装船 船舶靠泊 port terminal roll-on roll-off ship berthing
  • 相关文献

参考文献6

二级参考文献1

  • 1董志强,张志平.上海港外高桥港区6期工程初步设计[R].北京:中交水运规划设计院有限公司.2009. 被引量:1

共引文献183

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部