铜陵公铁两用长江大桥深水特大型沉井基础施工技术 被引量:20

Construction Technology for Deep-Water Huge Open Caisson Foundation of Rail-cum-Road Bridge over Changjiang River at Tongling
下载PDF
导出
摘要 铜陵公铁两用长江大桥3号主塔墩为深水特大型沉井基础,墩位水深、流急、地质气象条件复杂,施工难度大、技术含量高。重点介绍主墩特大型钢沉井整节段制造、运输,锚碇系统布置,钢沉井整节段接高、定位、着床,沉井下沉、封底等施工技术。在整个施工过程中研究和采用了多项关键技术,优质、高效、安全地完成了沉井基础的施工。 The foundation of No. 3 main tower pier of the rail-cum-road bridge over the Yangtze River at Tongling is a huge open caisson foundation where the water is deep, flow is urgent, geology and meteorology conditions are complex, and the construction is very difficult with a higher technology content. This paper mainly introduces the construction technologies, such as whole-segment manufacturing and transportation of huge steel open caisson, anchorage system layout, whole-segment jointing, positioning, bedding, sinking, bottom sealing and so on. Many key technologies were studied and adopted in the whole process of the construction, so the construction of this open caisson foundation has been completed safely with high quality and high efficiency.
作者 邱琼海
出处 《铁道标准设计》 北大核心 2013年第4期51-55,共5页 Railway Standard Design
关键词 公铁两用桥 长江大桥 沉井基础 施工 rail-cum-road bridge Yangtze River Bridge open caisson foundation construction
  • 相关文献

参考文献13

二级参考文献41

共引文献127

同被引文献176

引证文献20

二级引证文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部