期刊文献+

基于平均强化学习的订单生产方式企业订单接受策略 被引量:6

Order acceptance policy in Make-to-Order manufacturing based on average-reward reinforcement learning
下载PDF
导出
摘要 从收益管理思想出发,采用平均强化学习算法研究不确定环境下订单生产(MTO)方式企业的订单接受问题。以最大化平均期望收益为优化目标,采用多级价格机制,把订单类型、价格和提前期的不同组合作为系统状态划分标准,结合平均强化学习原理,提出了具有学习能力的订单接受算法(RLOA)。仿真结果表明,RLOA算法具有学习和选择性接受订单的能力,与其他订单接受规则相比,在平均收益、订单类型接受状况和适应性等方面都有较好表现。 From the perspective of revenue management,a new approach for order acceptance under uncertainty in Make-to-Oder(MTO) manufacturing using average-reward reinforcement learning was proposed.In order to maximize the average expected revenue,the proposed approach took order types and different combinations of price and leadtime as criteria for the classification of the system states based on multi-level pricing mechanism.The simulation results show that the proposed algorithm has learning and selective ability to accept the order.Comparisons made with other order acceptance policies show the effectiveness of the proposed algorithm in average revenue,accepted order types,and adaptability.
出处 《计算机应用》 CSCD 北大核心 2013年第4期976-979,共4页 journal of Computer Applications
基金 国家自然科学基金资助项目(71071059) 教育部人文社会科学项目(08JC630028) 教育部博士点基金资助项目(20100172120040)
关键词 订单接受 平均强化学习 订单生产方式企业 收益管理 order acceptance average-reward reinforcement learning Make-to-Order(MTO) manufacturing revenue management
  • 相关文献

参考文献17

  • 1HENDRY L, LAND M, STEVENSON M, et al. Investigating im- plementation issues for workload control (WLC) : a comparative case study analysis [ J]. International Journal of Production Economics, 2008, 112(1) :452 -469. 被引量:1
  • 2STEVENSON M, HENDRY L C. Aggregate load-oriented workload control: a review and a re-classification of a key approach [ J]. In- ternational Journal of Production Economics, 2006, 104(2) : 676 - 693. 被引量:1
  • 3GUERREROH H, KERN G M. How to more effectively accept and refuse orders [ J]. Production and Inventory Management, 1988, 29 (3):59 -63. 被引量:1
  • 4SLOTNICK S A. Order acceptance and scheduling: a taxonomy and review [ J]. European Journal of Operatioaal Research, 2011, 212 (1):1 -11. 被引量:1
  • 5YANG B, GEUNES J. Heuristic approaches for solving single re- source scheduling problems with job-selection flexibility [ R]. Gainesville FL, USA: University of Florida, Department of Industri- al and Systems Engineering, 2004. 被引量:1
  • 6CI-IARNSIRISAKSKUL K, GRIFFIN P M, KESKINOCAK P. Pri- cing and scheduling with leadtime flexibility [ J]. European Journal of Operational Research, 2006, 171 (1) : 153 - 69. 被引量:1
  • 7张欣,马士华.基于有限生产能力和产出缓存的订单接受策略[J].工业工程与管理,2008,13(2):34-38. 被引量:17
  • 8HERBOTS J, HERROELEN W, LEUS R. Dynamic order accept- ance and capacity planning on a single bottleneck resource [ J]. Na- val Research Logistics, 2007, 54(8) : 874 - 889. 被引量:1
  • 9范丽繁,陈旭.基于收益管理的MTO企业订单定价和接受策略[J].系统工程,2011,29(2):87-93. 被引量:12
  • 10SNOEK M. Neuro-genetic order acceptance in a job shop setting [ C]//Proceedings of the 7th International Conference on Neural Information Processing. Seoul: [ s. n. ], 2000:815 - 819. 被引量:1

二级参考文献19

  • 1罗利,萧柏春.收入管理理论的研究现状及发展前景[J].管理科学学报,2004,7(5):75-83. 被引量:52
  • 2熊中楷,李豪,向东.需求函数为非线性的按订单生产企业动态定价的特性研究[J].科技管理研究,2007,27(5):128-131. 被引量:10
  • 3HILL T. Manufacturing strategy [M]. New York: Irwin McGraw-Hill, 2000. 被引量:1
  • 4GUERREROH H, KERN GM. How tomore effectively ac cept and refuse orders[J]. Production and Inventory Management, 1988, 29(3):59-63. 被引量:1
  • 5HILL T. Manufacturing strategy-text and cases[M]. (2^nd ed. ). Blue Ridge. IL: Irwin. 1994. 被引量:1
  • 6BARUT M, SRIDHARAN V. Revenue management in orderdriven production systems [J]. Decision Sciences, 2005, 36 (1). 287-316. 被引量:1
  • 7ZIJM W H M. Towards intelligent manufacturing planning and control systems[J]. OR Spectrum, 2000, 22:313-345. 被引量:1
  • 8HALL N, MAGAZINE M. Maximizing the value of a space mission[J]. European Journal of Operational Research, 1994, 78: 224-241. 被引量:1
  • 9KESKINOCAK P, RAVI R, TAYUR S. Scheduling and reliable lead time quotation [or orders with availability intervals and lead time sensitive revenues [J]. Management Science, 2001, 47(1): 264-279. 被引量:1
  • 10DUENYAS I. Single facility due date setting with multiple customer classes[J]. Management Science, 1995, 41(3): 608-609. 被引量:1

共引文献24

同被引文献46

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部