七一新发煤业五采区防水煤柱合理留设研究 被引量:4

Research on rationally setting water-proof coal pillar for No.5 mining area of Qiyi Xinfa Coal Mining Company
下载PDF
导出
摘要 针对七一新发煤业五采区开采过程中面临的相邻矿井老空水灾害威胁的问题,对五采区水害原因进行分析,并结合现场实际地质生产条件,采用理论计算和数值模拟方法研究确定邻近矿井老空水的防水煤柱宽度为55m。现场实践表明,留设55m防水煤柱可以有效预防老空水突水,确保煤矿安全生产。 Aimed at the problem No. 5 mining area of Qiyi Xinfa Coal lyzed, and the water-proof coal pillar theoretical calculation and numerical conditions. The practice showed that prevent the goaf water inrush so that of goal water disaster from adjacent mines during mining in Mining Company, the reasons for water disaster were anain width of 55 m was determined for the adjacent mines by simulation combined with the actual geological production the water-proof coal pillar in width of 55 m could effectively the safe production of coal mine was ensured.
出处 《中国煤炭》 北大核心 2013年第3期80-83,91,共5页 China Coal
关键词 老空水 防水煤柱留设理论计算数值模拟 七一新发煤业 goaf water, setting water-proof coal pillar, theoretical calculation, numericalsimulation, Qiyi Xinfa Coal Mining Company
  • 相关文献

参考文献11

二级参考文献38

共引文献62

同被引文献22

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部