摘要 随着新疆南疆地区电网主网的联网加快及塔里木盆地石油的大开发,我院承担了新疆第一条伸向塔克拉玛干沙漠腹地的220kV送电线路。在沙漠中架设高压输电线路,由于其特殊的地貌、地质及气象条件等情况,因此对设计提出了更高的要求,根据设计、施工的要求,在线路测量设计中,测量方法及要求的侧重点有较大的变化。 Speed up the networking with the regional power grid network in South Xinjiang and the Tarim Basin oil development, the institute undertook toward the hinterland of the Taklimakan Desert in Xinjiang, the first 220kV transmission line. Erection of high voltage transmission lines, in the desert side of the design due to its special topography, geological and meteorological conditions , a higher demand, according to the requirements of the design, construction, the design of the line measurements, measurelnent methods and requirements focus of the larger changes. This article from the design process procedure of the measurement methods and requirements in the transmission line design in the desert.
作者 柴中
机构地区 新疆电力设计院
出处 《电力勘测设计》 2013年第1期32-33,37,共3页 Electric Power Survey & Design
关键词 沙漠 高压输电线路 测量方法 desert high-voltage transmission line measurement methods.
  • 相关文献

参考文献3

  • 1DL/T5076-2008,220kV及以下架空送电线路勘测技术规程[S]. 被引量:10
  • 2GB/T18314-2009,全球定位系统(GPS)测量规范[S]. 被引量:127
  • 3GB/T16818-2008,中、短程光电测距规范[S]. 被引量:2

共引文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部