期刊文献+

土工格栅加筋路堤影响因素的数值模拟研究 被引量:3

Numerical Simulation about Influence Factorsof Geogrid Reinforced Embankment
下载PDF
导出
摘要 采用FLAC对土工格栅加筋路堤不同铺设位置进行数值模拟,结果显示土工格栅加筋路堤铺设于底部效果最优,理论验证表明该模拟结果具备合理性。格栅材料、路堤材料、填土高度、过渡段模量比和格栅铺设范围是加筋土路堤的五个影响因素,对改善坡降差的效果有不同的影响。 By using FLAC to numerically simulate different laying position of geogrid reinforced embank- ment, it is showed that the optimal result is to lay the geogrid reinforced embankment on the bottom, which has been proved reasonable by theoretical verification. Grid material, embankment material, filling height, transition section modulus ratio and grille laying range are the five influencing factors of reinforced embankment with dif- ferent gradient difference improvement effects.
出处 《交通标准化》 2013年第6期50-54,共5页 Communications Standardization
关键词 土工格栅 加筋 路堤 模拟 geogrid reinforcement embankment simulation
  • 相关文献

参考文献11

二级参考文献27

  • 1俞仲泉,李少青.土工织物加固堤基的离心模型试验[J].岩土工程学报,1989,11(1):67-72. 被引量:26
  • 2叶见曙.桥头引道工后沉降控制标准的研究[J].东南大学学报(自然科学版),1997,27(3):12-17. 被引量:56
  • 3朱百里 沈珠江.计算土力学[M].上海:上海科学技术出版社,1985.. 被引量:2
  • 4邓卫东 陈环 等.土工织物加筋软基路堤的试验与计算分析[M].天津:天津大学,1989.. 被引量:1
  • 5朱湘.软土地基格栅加筋路堤结构性能研究[M].南京:东南大学,2000.. 被引量:1
  • 6Bob.Andrews.RN 2000 EYRE Highway,(South Australia) Pavement Rehabilitation & Widening[Z].http://www.csstech.com/eyebg.htm 2002-02-06. 被引量:1
  • 7TAN S A,CHEW S H,WONG W K.Sand-geotextile interface shear strength by torsional ring shear tests[J].Geotextiles and Geomembranes,1998,16:161-174. 被引量:1
  • 8赵维炳,殷宗泽等.土工数值分析方法.河海大学岩土工程研究生教材,199509. 被引量:1
  • 9 Bergado D T,Anderson L R. Soft Gr ound Improvement in Lowland and Other Environments.America:ASCE press,1997. 被引量:1
  • 10 Jewell R A.Soil Reinforcement wit h Gootextiles.London:CIRIA,1996.Vol.17 No.1 被引量:1

共引文献124

同被引文献23

  • 1於永和,李素艳.基于L-M法BP神经网络的高填路堤地基沉降预测[J].交通标准化,2006,34(10):167-171. 被引量:5
  • 2蔡袁强,刘飞禹,徐长节,潘晓东.交通荷载下加筋道路弹黏塑性有限元分析[J].浙江大学学报(工学版),2006,40(10):1743-1748. 被引量:2
  • 3刘飞禹,赵国兴,蔡袁强,孙宏磊.移动荷载下加筋道路系统的动力响应[J].浙江大学学报(工学版),2007,41(1):57-64. 被引量:7
  • 4刘飞禹,蔡袁强,徐长节,王军.交通荷载作用下软基加筋道路加筋效果分析[J].岩土工程学报,2007,29(11):1659-1664. 被引量:5
  • 5BRIANCON L, SIMON B- Performance of pile-supported embankment over soft soil: fuU-scale experiment [ J ]. Journal of Geotechnical and Geoenvironmental Engineering,2011,137 (4) :324-331. 被引量:1
  • 6SADREKARIMI A, OLSON S M. Shear band formation observed in ring shear tests on sandy soils [ J ]. Journal of Geotechnical and Geoenvironmental Engineering,2010,136(2) :366-375. 被引量:1
  • 7HATZIGEORGIOU G D, BESKOS D E. Dynamic inelastic structural analysis by the BEM:A review [ J ]. Engineering Analysis with Boundary Elements, 2011,35 : 159-169. 被引量:1
  • 8RAJESH S,VISWANADHAM B "~ S. Centrifuge modeling of landfill covers [ J ]. Journal of Geoteehnieal and Geoenvironmental Engineering, 2011,137(4) :332-342. 被引量:1
  • 9CAI Y Q, SUN H L, XU C J. Steady state responses of poro-elastic half-space soil medium to a moving rectangular load [ J ]. Intemational Journal of Solids and Structures,2007,44:7183-7196. 被引量:1
  • 10JAMSHIDI R, TOWHATA I, GHIASSIAN H, et al. Experimental evaluation of dynamic deformation eharacteristies of sheet pile retaining walls with fiber reinforced backfill[ J]. Soil Dynamics and Earthquake Engineering ,2010,30(6) :438-446. 被引量:1

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部