摘要
In this paper,we study a model on joint decisions of scheduling and subcontracting, in which jobs(orders) can be either processed by parallel machines at the manufacturer in-house or subcontracted to a subcontractor.The manufacturer needs to determine which jobs should be produced in-house and which jobs should be subcontracted.Furthermore,it needs to determine a production schedule for jobs to be produced in-house.We discuss five classical scheduling objectives as production costs.For each problem with different objective functions,we give optimality conditions and propose dynamic programming algorithms.