基于混合策略纳什均衡的风电配套输电线路投资决策 被引量:1

Investment Decision for Wind Power Interconnection Lines Based on Mixed Strategy Nash Equilibrium
原文传递
导出
摘要 在市场环境下,引入非合作博弈理论来对风电配套输电线路投资决策过程中各利益主体的行为策略进行描述;在此基础上,建立了基于混合策略纳什均衡的风电配套输电线路投资决策模型,并提出了基于改进禁忌搜索算法的求解方法;最后通过算例分析比较了电网公司投资风电配套输电线路与风力发电商投资风电配套输电线路两种情况下新建风电配套输电线路容量大小。 In the market environment, non-cooperative game theory is introduced to describe the behavioral strategies of each stakeholder in the process of investment decision for wind power interconnection lines ; thereupon i the invest- ment decision model for wind power interconnection lines based on mixed strategy Nash equilibrium is established, and the solution based on Modified Taboo Search Algorithm(MTSA) is proposed. Finally, the capacity of the newly- built wind power intereonnection lines invested by power grid company is compared with that by wind power producer through actual calculation example.
出处 《华东电力》 北大核心 2013年第2期254-258,共5页 East China Electric Power
基金 国家自然科学基金资助项目(71271082) 国家软科学研究计划资助项目(2012GXS4B064)~~
关键词 风电 配套输电线路 投资决策 混合策略纳什均衡 非合作博弈 改进禁忌搜索算法 wind power interconnection line investment decision mixed strategy Nash equilibrium non-coopera- tire game Modified Taboo Search Algorithm(MTSA)
  • 相关文献

参考文献9

二级参考文献76

共引文献164

同被引文献11

  • 1J H Roh, M Shahidehpour, Y. Fu. Market-based co- ordination of transmission and generation capacity plan- ning [J]. IEEE Trans. Power Syst, 2007, 22 (4): 1406 - 1419. 被引量:1
  • 2Motamedi, H Zareipour, M. O. Buygi, etc. A trans- mission planning framework considering future genera- tion expansions in eleetrieity markets [ J ]. IEEE Trans. Power Syst. , 2010, 25 (4) : 1987 - 1995. 被引量:1
  • 3L Baringo, A J Conejo. Wind power investment within a market environment [J]. App. Energy, 2011, 88 (9) : 3239 -3247. 被引量:1
  • 4S de la Torre, A J Conejo, J Contreras. Transmission expansion planning in electricity markets [ J ]. IEEE Trans. Power Syst, 2008, 23 (1): 238-248. 被引量:1
  • 5Y Zhou, L Wang, J D McCalley. Designing effective and efficient incentive policies for renewable energy in generation expansion planning [ J ]. App. Energy, 2011, 88 (6): 2201-2209. 被引量:1
  • 6Baringo L, Conejo A J Transmission and wind power in- vestment. IEEE transactions on power systems [ J ]. 2012, 27 (2): 885-893. 被引量:1
  • 7郭磊.关于均衡约束数学规划理论和算法的若干研究[D].大连:大连理工大学,2013. 被引量:1
  • 8马其燕,秦立军.智能配电网关键技术[J].现代电力,2010,27(2):39-44. 被引量:82
  • 9王召旭,周明,吴迪,许慎专.风电并网电力系统动态经济调度问题的研究[J].现代电力,2011,28(2):37-42. 被引量:11
  • 10王跃锦,薛松,朱晓丽.基于MILP-ANN方法的低碳智慧岛分布式发电管理模型[J].华东电力,2011,39(9):1414-1418. 被引量:3