摘要
结合国内600 MW至于1000M火力发电厂建设工程7号、8号合体低压加热器设备吊装项目的实施情况,总结出吊装7号、8号合体低压加热器的三种方法,并从安全、进度、经济及吊装对周围影响的程度进行分析,比较、做出评价。
Based on the implementation of No. 7 and No. 8 fit low - pressure heater equipment installation project in domestic 600 MW to 1000MW coal- fired power plant construction project, this paper summarized three methods to hoisting No. 7, No. 8 fit low -pres- sure heater, and make evaluation, analysis and comparison from security, progress, economy and the impact on the surrounding of hoisting equipments.